CSFB commissioned LanTroVision, a company with over 10 years of expertise in the design and installation of structured cabling systems, to manage all aspects of the project. The cabling system would cover CSFB three floors in the new building, including trading room specific floor plates and diverse mechanical and electrical systems. The main closet (central IT Suite) contained over 200 racks and, due to the extensive length of the building, the main closet fed into two sub-equipment rooms (horizontal closets) on each level, to serve the building North and South wings.